1708#, No. 1 building, Lane 2742, Pudong Avenue Road, Pudong, Shanghai | lotus.peng@higeemachinery.com.cn |
Product Details:
Payment & Shipping Terms:
|
Name: | 5 Gallon Bottle Filling Machine | Filling Speed: | 80-120 Pcs Per Hour |
---|---|---|---|
Bottle Type: | 20 Liter Bottle 5 Gallon Barrel Etc | Filling Range: | 5 Liter , 10 Liter 18.9 Liter , 5 Gallon |
Control: | PLC | Machine Material: | SS 304 Food Grade |
Machine Size: | 2200 *2000 * 2200 Mm | Weight: | 350 Kg |
High Light: | water filling equipment,automatic water bottle filling machine |
5 gallon water filling machine and 20 liter bottled water filling machine
Application
HGXY-1 semi-automatic barrel filling machine is suitable for 5 gallon of pure water or mineral water plant , 5 gallon bucket, the equipment is simple to operate, only 1 - 2 workers can operate, is ring, filling, pressure capping in one, The equipment adopts a time relay control system with reliable performance, easy operation and simple maintenance. It is the most ideal pure/mineral water filling equipment in China.
The function
This machine is divided into three parts: Washing barrel, Filling part and pressure cap part
Washing barrel part :
(1) washing machine drive mechanism;
(2) bottle holder;
(3) washing barriel pump;
(4) filling pump;
(5) filling valve;
(6) pressure cap device.
The electrical part :
It consists of a time relay.
Feature
1. Semi-automatic working, filling level, filling time adjustable.
2. Food grade 304 stainless steel contact parts.
3. All 304 stainless steel construction.
4. Food Class stainless steel washing pumps and filling pumps.
5. No bottle no washing, no bottles no filling, no bottle no capping.
6. This machine production capacity is 60 BPh
Technical parameter
Model | HGXY-1 |
Capacity | 80-100 bottle per hour |
Washing bottle heads | 1 |
Bottle Size | 5 gallon bottle |
Power | 220v 50 hz 1 phase 1.2kw |
Dimension | 1600×510×1500 |
Machine Weight | 350 kg |
Our machine pictures and samples :
water filling machine | oil filling machine |
shrink sleeve labeling machine | 3 in 1 filling machine |
Our service:
Guarantee:
We response for one year warranty for the machine, however, it without any human conduct. And provide one-year free spare part for client. And send engineer to client’s company with client’s provision for flight charge and accommodation. Help install the machine, teaching their staff operate the machine and also, we do have a private school which help our client sending their staff to china, help them training.
After sales service:
After the equipment are arrived at the customer’s site, the customer is responsible for unpacking and arranging the equipment according to the placement drawing; and does under our install-adjust technicians’ guidance. Costs of the staff are decided at last.
Training
We are responsible for offering the technical training to user. The training content includes the structure and maintenance of the equipment, control and operation of the equipment. Through training, users' technical staff can grasp and the skill of operation and maintenance proficiently, and deal with the general troubles in time. We will appoint qualified technical staff for the guidance.
1.The buyer can send staff to our company for learning.
2.Quality assurance
3.We guarantee the goods offered are brand-new, not used, with latest design and suitable material made, and we guarantee the specification of the equipment is consonance with the contract.
4.We guarantee the line achieve product technical performance indicators within 5 days after feeding operation through the correct guidance of the installation and commissioning.
5.We are responsible for the fault and damage of the production line caused by our design, technology, manufacture, installation, adjustment and material defect etc. that all belong to our responsibility.
6.The warranty period is 12 months after acceptance check of the production line. If there is any different between the furnished equipment in the customer’s factory and the equipment concerned in the contract, the users have the right to pass the inspection book to the legal department to claim for compensation to our company within goods warranty period.
Warranty
Offer 12 months maintenance period to the problem that caused by our design, manufacture and the material quality, and offer the relevant parts and effective service for free for above reason. We will offer a widely and favorable technical support, after service all the time after guarantee period.
500ml Automatic Water Filling Machine Small Scale Water Bottling Production Line
380V / 50Hz 3 Phases Automatic Water Filling Machine 2 Filling Heads CE Approval
24V DC Drinking Water Bottle Filling Machine / Mineral Water Bottling Machine
3-5l Mineral Water Filling Machine / 300 Bph Filling And Capping Machine 1800 Kg
6 Capping Head Carbonated Soda Filling Machine / Carbonated Drink Bottling Machine
Glass Bottle Carbonated Beverage Filling Machine 1000 Bph Filling Speed
Carbonated Soft Drink Filling Machine , Hot Fill Soda Bottling Equipment
330 Ml Beer Bottle Filling Machine , Pure Water Filling And Sealing Machine
Double Side Sticker Labeling Machine For Shampoo Bottles Adhesive Labeling
Automatic Sticker Labeling Machine For Pvc Food Can Round Bottle Labeling
Side Round Bottle Labeling Machine Automatic High Speed For Plastic Cup
Turntable Vial Sticker Labeling Machine , Bottle Sticker Machine 60 - 300pcs Per Minute